Pollution in Ganga: NGT directs UP Jal Nigam to finish sewer work expeditiously

NEW DELHI: The National Green Tribunal has directed UP Jal Nigam to expeditiously full the work of sewer connectivity to households at Narora city in
Bulandshahr district to make sure that no untreated water is discharged into the Ganga.
The inexperienced panel slammed the Jal Nigam over non-functional sewage therapy plant at Narora and discharge of untreated sewage in a pond adjoining to the river.
“UP Jal Nigam should carry out its accountability and can’t take the plea that fault was of the contractor. The work of sewer connectivity to households be accomplished expeditiously which can be reviewed by the principal secretary, Urban Development, UP,” a bench headed by NGT Chairperson Justice A Ok Goel mentioned.
It mentioned the Jal Nigam is held liable to pay Rs 5 lakh for his or her default which can be deposited with the state air pollution management board inside one month to be spent for restoration of the atmosphere.
The NGT was perusing a report filed by an oversight committee headed by former excessive court docket choose which mentioned the chief engineer of the Jal Nigam had knowledgeable it that the Naraura Project was sanctioned in 2015 and as per the undertaking, it was proposed that handled water shall be discharged into river Ganga.
“The sewage therapy plant was put in in 2018 however turned operational since February 2. As per the inspection report submitted by UPPCB, the capability of Naraura STP is of four MLD (million litres per day), however present complete utilisation is of two MLD. Despite having extra capability, nonetheless 5 MLD untreated sewage is being discharged in river Ganga by drains,” the committee mentioned.
The tribunal was listening to a plea filed by residents of Nodai Wagar village in Narora city, alleging that the STP unit was discharging untreated wastewater within the Ganga.
There was no pipeline for discharging handled effluent, the plea mentioned.

Source link